Zimbabwe Power Company (ZPC) a subsidiary of ZESA HOLDINGS is the leading generator of electrical energy in Zimbabwe and supplies the bulk of the nation’s electrical power requirements from its five power stations at Kariba, Harare, Munyati, Bulawayo, and Hwange. The company is currently undertaking a project to rehabilitate Hwange thermal power plant and is inviting suitably qualified, motivated, and experienced Zimbabwean Experts to fill the following positions that have arisen within WAPCOS Limited – a consulting firm contracted by ZPC to carry out project management consultancy services to the project. The positions will be based in Hwange, Zimbabwe.
Electrical Expert x1
THE POSITIONS
The positions are senior positions reporting to the WAPCOS Team Leader based at the project site. The experts in their various fields will be responsible for site supervision and offering technical advice to the ZPC project management team during project execution. The standard expectation is that the experts should have first degrees in the field of specialisation, at least 10 years post-graduation experience, willingness to travel, and tolerance of multi-cultural work environments.
Qualifications and Experience
⦁ A first Degree in the relevant field of specialization
⦁ A Post Graduate qualification is an added advantage
⦁ Full membership of a recognized professional Institution.
⦁ 10 years of post-graduation experience
⦁ Formal project management certification, for example, PRINCE 2.
Key Competences
⦁ Plant condition analysis
⦁ Repowering and Life extension work specification
⦁ Complex bid evaluation and adjudication
⦁ Repowering and Life extension standards
⦁ Construction supervision
⦁ Review of engineering designs and drawings
⦁ Quality control
⦁ Supervision of testing and commissioning
Job Summary
More Information
-
Job Application Details
APPLICATION DETAILS
Applications from prospective candidates with detailed curriculum vitae and certified copies of certificates should be received by not later than 14 April 2023 and addressed to:- The Managing Director Zimbabwe Power Company P.O Box MP 274 Mount Pleasant HARARE Or email: [email protected] or Hand delivery to The Managing Director Zimbabwe Power Company 12th Floor, Megawatt House 44 Samora Machel Avenue HARARE Fai:DI06604702 NB. ZPC's recruitment policy does not require any prospective job seekers to make payments to the Organisation or any of its employees as a way of securing employment.
Please say that you got this job advertisement through Jobs Zimbabwe